Changes, Chances and Challenges in Offshore Wind

Al Dennis has recently joined as Principal Engineer at Empire – and brings with him a wealth of wisdom on offshore wind. We sat down to discuss why he joined Empire, how he sees the future of offshore wind and what litter picking can teach you about being a good...

Empire Projects in Europe (Part 2)

By Karl Davis.  On the second leg of my ‘offshore wind’ tour of Spain, I took in the Aviles site of Windar. In the picture below we see some lovely yellow TP’s (Transition Pieces) ready for upending and fixing of the External Working Platforms. In...

Empire Projects in Europe

By Karl Davis. I recently spent time in Spain supporting Scottish Power (SPR) visiting foundation fabricator Haizea and flange fabricator Euskal.  Take a look at some of these fantastic pictures from the trip. Starting with the SPR team gazing longingly at these steel...

Empire Engineering Opens a Beijing Office

Empire Engineering Opens a Beijing Office We are thrilled to announce the official opening of our Beijing office. The office is headed up by Chief Representative, Shen Cao and located in Haidian District, Beijing’s educational and technological centre. Empire...

Webinar on demand: Big Bolted Connections

By Karl Davis. For our final Tech Session for 2020 we asked the thorny question: Big Bolted Connections, is the industry ready? This was the fifth Tech session in our 2020 series. Our original plan had been to run our Foundation conference for a second year but then,...

Read our Guide to Offshore Foundations

Packed full of knowledge about the technical developments and challenges facing our industry in both fixed bottom and floating offshore wind.

Read our Guide to Offshore Foundations

Get your copy of the guide

You have Successfully Subscribed!